Sealed Plans and Footing Design
Monument signs sit at grade, so the whole face takes wind and the footing has to resist overturning and sliding. The plan sizes the footing and checks bearing pressure for every load combination.
Choose a grouted CMU monument, an aluminum-clad monument on a steel frame, or a cabinet on internal posts in drilled shafts. The wall reinforcing, dowels, posts, base plates and anchor rods are designed and shown on the sheet.
What's covered
- CMU wall reinforcing and footing dowels
- Steel frame posts, base plates and anchor rods
- Footing size, thickness and reinforcing
How it works
- Enter the job address. We look up the wind speed and flood zone there.
- Enter the sign type and size. The form shows only the options that meet code at that address, and the flat price.
- Pay online. A licensed engineer reviews, signs and seals the plan in 48 to 72 hours, or the same day with rush.
Licensed in Florida (PE 82229), Alabama (PE 36987) and Texas (PE 133174, Firm F-22869).
